The Plumbing and Electrical Pricing program will help you estimate and price all your plumbing and electrical projects by simple question and answer based interface. Plumbing: Answer are you using copper or PEX and are you supplying fixtures. Then answer the questions how many are you installing: Shower valve, shower diverter, Rain shower head, acrylic shower base, kurdi shower base drain, toilet, vanity, etc. Electrical: Answer are you supplying rough materials, finish materials, fixtures, appliances and central units. Then answer the questions how many are you installing: surface mount light circuit, how many fixtures on the circuit, how many switches operate the circuit. To the ones of you that do HVAC also. I’m sorry, HVAC isn’t my forte.
Contained in the program:
“Intro” for entering your general charging rates, service fees, workers on site, working hours per day, site prep and cleanup time per day, etc.
“Plumbing” (full version) answer are you using copper or Pex and are you supplying fixtures.
Then answer the questions how many are you installing: Shower valve, shower diverter, Rain shower head, acrylic shower base, kurdi shower base drain, toilet, vanity, etc.
“Electrical” (full version) answer are you supplying rough materials, finish materials, fixtures, appliances and central units.
Then answer the questions how many are you installing: surface mount light circuit, how many fixtures on the circuit, how many switches operate the circuit.
“Task Pricing” as I mentioned before if you miss the manual part of things; then this is the section for you.
This section is for entering any extra tasks that come to mind and the materials associated with those tasks. I have also found that the Task Pricing section is a good way to enter change orders in a project. I start a follow up file on the project and enter the changes and add-ons as things progress.
“Misc Budgets” is another small extra thrown into the set.
This section is used to cover the surrounding elements of a job such as: plan production, permits, water and sewer taps, electric connection fees.
“Pricing Summary” is exactly that. It’s where everything comes together: material costs, plans, permits, and fees, labor costs, final pricing add-on and fees.
And finally the master material list, which you can review and alter at this point before moving on to print.
“Material Print List” this is the section for printing your material list.
Simply click the trim list button; reducing the list to only the materials you are using for this job. And then click the print list button.
Reviews
There are no reviews yet.